Changes between Version 53 and Version 54 of RELIEF12-2
- Timestamp:
- 04/05/2012 08:18:48 PM (14 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
RELIEF12-2
v53 v54 224 224 225 225 = Actual Event = 226 "The best-laid plans of mice and men..." 226 "The best-laid plans of mice and men..." Actually, things went pretty well over all. 227 228 OpenBTS operators: 229 * [http://www.rangenetworks.com Range Networks] supplied the OpenBTS-based GSM basestation equipment. 230 * [http://tethr.org Tethr] brought their integrated Ushahidi-WiFi node and a BGAN terminal. 231 * [http://www.medweb.com/ MedWeb] brought an integrated system with embedded GSM basestation functionality, implemented with a Range OpenBTS "OEM kit". They also brought a VSAT van and more BGAN terminals. 232 233 With technical assistance from: 234 * [http://www.tropo.com Tropo], who provided routing services for speech calls and text messages to and from the outside world. 227 235 228 236 The weather reports are important because we spent the entire time outside. … … 240 248 [[Image(DSCN0315.jpg)]] 241 249 242 Our main area of activity was at !McMillan airfield: McMillanBTS, Medweb's satellite truck, and the !Range/Tethr solar-powered "operations center", which is a couple of tables a pair of tents.250 Our main area of activity was at !McMillan airfield: the McMillanBTS installation (on the mast), Medweb's satellite truck, and the !Range/Tethr solar-powered "operations center", which is a couple of tables a pair of tents. 243 251 244 252 [[Image(IMG_1865.JPG)]]
![(please configure the [header_logo] section in trac.ini)](http://wush.net/trac/rangepublic/raw-attachment/wiki/WikiStart/PublicReleaseLogo.png)
